Astm c926 free download3/11/2024 ![]() ![]() Hardened materials should be mechanically removed. Tools and equipment should be cleaned with water immediately after use. ![]() Let the composition stands for nearly 5 minutes and remix again.Īpply the mixture using a suitable spraying unit or with Tyrolean machine manually till you reach the required thickness (2 to 3 mm).ĭASHBOND SP consists of Portland cement, special high strength hydraulic binders, aggregate and special chemical additives to achieve a high strength adhesion with water resistance and crack free coat. Mix until a uniform, lump free consisting mix is achieved.įor mixing process, a slow speed drill (200 -300 rpm) fitted with a suitable paddle is recommended. Running water on the surface should be allowed to drain prior to application.Īdd the content of DAHSBOND SP bag into a container of 10.5-11 Liters of clean water. Fibers ASTM C 897 4.7 Specification C 1116 on alkali -resistant fibers, glass fibers, nylon, polypropylene or carbon fibers. Moisten the concrete surface or the AAC Block wall with clean water before applying DASHBOND SP. Sand for Base Coats Specification ASTM C 897 B. Remove dust, loose particles, grease and traces of foreign materials which may affect the adhesion.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |